Position: PPC Manager (Production Planning & Control)
Industry:Â Heavy Fabrication / Structural Steel/ Bridge Fabrication / Pre-Engineered Buildings (PEB)
Experience: 10–12 Years
JobPurpose:Â To plan, coordinate, monitor, andcontrol manufacturing activities to ensure timely execution of fabricationprojects, optimum utilization of resources, and adherence to deliveryschedules, quality standards, and productivity targets.
KeyResponsibilities
ProductionPlanning
- Prepare detailed production plans based on project schedules, customer requirements, and available capacities.
- Develop weekly and monthly production schedules for fabrication, welding, machining, painting, and dispatch activities.
- Coordinate with Design, Procurement, Quality, and Production departments for smooth workflow execution.
- Monitor progress against production plans and take corrective actions to eliminate delays.
MaterialPlanning & Control
- Review BOMs, drawings, and material requirements for projects.
- Coordinate with Procurement and Stores to ensure timely availability of raw materials, consumables, and bought-out items.
- Monitor material shortages and prepare material requirement reports.
- Track material consumption and minimize wastage.
ProductionMonitoring
- Track daily production achievements against planned targets.
- Prepare and analyze production MIS reports, productivity reports, and variance analysis.
- Identify bottlenecks in fabrication processes and recommend corrective actions.
- Ensure optimal utilization of manpower, machines, and fabrication facilities.
Coordination& Scheduling
- Liaise with Project Management teams to align production schedules with project milestones.
- Coordinate with Quality Assurance for stage inspections and release of fabricated components.
- Work closely with Dispatch and Logistics teams to ensure timely shipment of finished products.
Requirements
RequiredQualifications
- B.E./B.Tech/Diploma in Mechanical Engineering, Production Engineering, or related discipline.
- Certification in Production Planning, Supply Chain Management, or ERP systems will be an added advantage.
RequiredExperience
- 10–12 years of relevant experience in Heavy Fabrication, Structural Steel Fabrication, Bridge Fabrication, PEB, Industrial Equipment Manufacturing, or similar industries.
- Experience in handling fabrication planning, scheduling, and resource management for large-scale projects.
- Attention to detail
- Ability to work under pressure and meet deadlines
KeyPerformance Indicators (KPIs)
- On-time project delivery performance
- Production plan adherence (%)
- Resource utilization efficiency
- WIP inventory control
- Material availability and shortage management
- Reduction in production delays and bottlenecks
- Productivity improvement initiatives
- Accuracy of production MIS and reporting
Benefits
Learn more about this Employer on their Career Site
