SonicJobs Logo
Left arrow iconBack to search

Construction Project Manager

RQ Construction
Posted 3 months ago, valid for 21 days
Location

Jacksonville, FL 32202, US

Salary

$110,000 - $170,000 per year

Contract type

Full Time

By applying, a Sonicjobs account will be created for you. Sonicjobs's Privacy Policy and Terms & Conditions will apply.

SonicJobs' Terms & Conditions and Privacy Policy also apply.

Sonic Summary

info
  • RQ Construction is looking for experienced Construction Project Managers to oversee projects on U.S. military bases in Georgia and Florida.
  • The role involves managing construction projects from planning to completion while ensuring quality, budget, and schedule standards are met.
  • Candidates must have a Bachelor's degree in Construction Management or a related field and at least 6 years of experience in the construction industry, with a minimum of 2 years in project management.
  • The annual salary for this position ranges from $110,000 to $170,000, and it requires U.S. citizenship due to project requirements.
  • This is a fully on-site role, and candidates are encouraged to apply locally, although relocation or travel may be necessary.

RQ Construction is seeking experienced Construction Project Managers to support field operations on active U.S. military bases in Georgia and Florida.

In this role, the Project Manager will lead construction projects from concept through completion, ensuring all phases, from pre-construction planning and design to final handover, are executed efficiently. The position is responsible for delivering projects that meet company standards for quality, budget, and schedule, while upholding RQ's Mission, Vision, and Values.

This is a fully on-site role. Candidates based locally are strongly encouraged to apply, though relocation or travel may be necessary. Due to project requirements on military installations, U.S. citizenship is mandatory.

About RQ Construction
Established in 1996, RQ Construction, LLC has evolved from a regional contractor in Southern California's commercial and government design-build market into a firm with nationwide and international capabilities. Headquartered in Carlsbad, California, the company provides comprehensive design-build services across the U.S., utilizing dedicated on-site teams for each project. RQ specializes in delivering fast-track construction projects for both public and private sector clients, with a strong focus on Department of Defense work.

Compensation & Benefits

  • Annual Salary: $110,000 - $170,000
  • Comprehensive benefits package including medical, dental, and vision coverage
  • 401(k) plan with employer matching contributions

Qualifications & Experience

  • Bachelor's degree in Construction Management, Engineering, or a related discipline required (or equivalent combination of education and professional experience)
  • Minimum of 2 years managing commercial construction projects or similar responsibilities
  • At least 6 years of increasing responsibility within the construction field, including roles such as Project Engineer or Assistant Project Manager
  • Prior experience working in a design-build environment is preferred
  • Proficient working knowledge of Microsoft Office tools (Word, Excel, PowerPoint, Outlook)
  • Experience with construction software such as Primavera P3/P6, Viewpoint, BIM platforms, or Revit is advantageous
  • CPR, First Aid, and OSHA 30 certifications required (training can be provided if needed); STS certification is a plus
  • LEED Green Associate or Accredited Professional credentials are preferred

Join RQ Construction and contribute to a team dedicated to delivering innovative, high-quality construction projects with a strong emphasis on safety and operational performance.

We are an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, creed, gender (including gender identity and gender expression), religion (all aspects of religious beliefs, observance or practice, including religious dress or grooming practices) marital status, registered domestic partner status, age, national origin or ancestry, physical or mental disability, medical condition (including cancer or a record or history of cancer, and genetic characteristics), sex (including pregnancy, childbirth, breastfeeding or related medical condition), genetic information, sexual orientation, veteran status, or any other basis or status protected by federal, state, or local law or ordinance or regulation.

All candidates considered for hire must provide evidence of identity and U.S. work authorization at the time of hire. Additionally, all candidates must successfully pass a drug screening and commercial criminal background check, including a stricter Department of Defense background check, for access to job site at military base (if applicable for position being hired for).




Learn more about this Employer on their Career Site

Apply now in a few quick clicks

By applying, a Sonicjobs account will be created for you. Sonicjobs's Privacy Policy and Terms & Conditions will apply.

SonicJobs' Terms & Conditions and Privacy Policy also apply.