Requisition ID:Â 96862Â
Florida Power & Light Company is the largest electric utility in the U.S., providing reliable energy to nearly 12 million Floridians. With one of the nation’s most fuel-efficient, cost-effective power generation fleets and industry-leading reliability, we’re redefining what’s possible in energy. Want to be part of something powerful? Join our outstanding team and help shape the future of energy.
Â
Position Specific Description
Florida Power & Light is seeking an experienced individual for its Central Maintenance Planning team to support overhaul planning of its Combined Cycle Power Generation Fleet.
Â
The ideal candidate shall be well organized and process oriented, have a bias for action, and excel at building relationships with internal and external stakeholders. Routine interface with site personnel, Fleet Engineering, Integrated Supply Chain, and Suppliers are required to accurately plan and coordinate maintenance for:
- Steam Turbines & Support Systems
- Steam Turbine Valves
Â
Central Maintenance Planners require capacity to manage large workloads, flexibility when priorities shift, and the drive to meet established Major Maintenance Process commitments. Â Key deliverables of this role are:
- Performing scope validation and jobsite walk-downs
- Establishing accurate work order cost and schedule estimates
- Supporting procurement of materials and services
Â
The following credentials are highly desired for the position:
- 5yr Min of Steam Turbine experience (Maintenance/Project Management/Planning)
- Bachelor's in Mechanical or Marine Engineering
- Project Management Professional Certification
- Six Sigma Green Belt
Â
Lastly, this position is planned to be based out of the Jim Robo Campus located in Palm Beach Gardens, but working from one of the FPL Fossil Sites within Florida will be considered based on experience and capabilities of the candidate selected and requires hiring manager approval.
Learn more about this Employer on their Career Site
